{"id":2165,"date":"2023-12-18T14:47:20","date_gmt":"2023-12-18T19:47:20","guid":{"rendered":"https:\/\/mtdomr.mywhc.ca\/?p=2165"},"modified":"2026-03-30T14:57:23","modified_gmt":"2026-03-30T18:57:23","slug":"iso-50001-confederation-heights-central-heating-and-cooling-plant","status":"publish","type":"post","link":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/","title":{"rendered":"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\">April 7, 2022<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\" id=\"ember9591\">The second in a series about the ISO 50001 Standard and the collaboration between Public Service and Procurement Canada (PSPC) and Innovate Energy (IE).<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\" id=\"ember9592\">Carlo Burri had retired from Public Service and Procurement Canada when he was asked to helm the operations at the Confederation Heights Plant located on Heron Road by Black &amp; Mcdonald. Burri had previously been Plant Chief at the National Research Council Plant on Sussex Drive and was familiar with the developing energy policy surrounding efficiency.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\" id=\"ember9593\">Working in the plant proves challenging, especially in hot weather and gauging the capacity of the peak loads.&nbsp;Plant operators are tasked with deciding which equipment to use and when, while maintenance is necessary to keep the boilers and chillers running efficiently.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\" id=\"ember9594\">At the Confederation Heights Plant there is a Plant Chief, Plant Manager, Administrator, Operator and Maintenance Mechanic working at all times. Confederation Heights looks after 9 buildings, a relatively small number compared to the other plants on the district energy system.&nbsp;Burri noted to me that COVID-19 has decreased the load demand significantly as not as many employees are in the buildings.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\" id=\"ember9595\">According to Burri, ISO 50001 Standard hasn\u2019t been difficult to maintain. He attributes this to the equipment (50 year old boilers and 20 year old chillers) and the use of variable speed drive which runs slower and more efficiently. At the plant the boilers and chillers are manually started, with a warm stand by boiler on at all times. The chillers are turned off in October, and tested to prepare for the heat and humidity of Ottawa\u2019s summer months.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\" id=\"ember9596\">Although Confederation Heights is run by Black&amp;McDonald, it is all part of the facilities management provided by Innovate Energy. Clear and accurate communication among staff and management is paramount to maintain the ISO 50001 certification and emphasizes the importance of collaboration through a P3 contract.<\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"231\" height=\"282\" src=\"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-1.jpg\" alt=\"\" class=\"wp-image-2212\"\/><\/figure>\r\n","protected":false},"excerpt":{"rendered":"<p>April 7, 2022 The second in a series about the ISO 50001 Standard and the collaboration between Public Service and Procurement Canada (PSPC) and Innovate Energy (IE). Carlo Burri had...<\/p>\n","protected":false},"author":8,"featured_media":2215,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_crdt_document":"","footnotes":""},"categories":[25],"tags":[66,74,75,87,88],"class_list":["post-2165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-updates","tag-district-energy-system","tag-energy-services-acquisition-program","tag-esap","tag-iso","tag-iso-50001"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ISO 50001 - Confederation Heights&#039; Central Heating and Cooling Plant - Innovate Energy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ISO 50001 - Confederation Heights&#039; Central Heating and Cooling Plant - Innovate Energy\" \/>\n<meta property=\"og:description\" content=\"April 7, 2022 The second in a series about the ISO 50001 Standard and the collaboration between Public Service and Procurement Canada (PSPC) and Innovate Energy (IE). Carlo Burri had...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Innovate Energy\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-18T19:47:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-30T18:57:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"231\" \/>\n\t<meta property=\"og:image:height\" content=\"282\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"gregjodoin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DES_REQ\" \/>\n<meta name=\"twitter:site\" content=\"@DES_REQ\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"gregjodoin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/\"},\"author\":{\"name\":\"gregjodoin\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#\\\/schema\\\/person\\\/c4be88e7f16992f06bd9454b6c438f35\"},\"headline\":\"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant\",\"datePublished\":\"2023-12-18T19:47:20+00:00\",\"dateModified\":\"2026-03-30T18:57:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/\"},\"wordCount\":318,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/image10-e1701700335278-2.jpg\",\"keywords\":[\"district energy system\",\"Energy Services Acquisition Program\",\"ESAP\",\"ISO\",\"ISO 50001\"],\"articleSection\":[\"Project Updates\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/\",\"url\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/\",\"name\":\"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant - Innovate Energy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/image10-e1701700335278-2.jpg\",\"datePublished\":\"2023-12-18T19:47:20+00:00\",\"dateModified\":\"2026-03-30T18:57:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#primaryimage\",\"url\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/image10-e1701700335278-2.jpg\",\"contentUrl\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/image10-e1701700335278-2.jpg\",\"width\":231,\"height\":282},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/iso-50001-confederation-heights-central-heating-and-cooling-plant\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Updates\",\"item\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/project-updates\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/\",\"name\":\"Innovate Energy\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#organization\",\"name\":\"Innovate Energy\",\"url\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mtdomr.mywhc.ca\\\/wp-content\\\/uploads\\\/2019\\\/07\\\/logotype-innovate-energy.png\",\"contentUrl\":\"https:\\\/\\\/mtdomr.mywhc.ca\\\/wp-content\\\/uploads\\\/2019\\\/07\\\/logotype-innovate-energy.png\",\"width\":504,\"height\":150,\"caption\":\"Innovate Energy\"},\"image\":{\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/DES_REQ\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/ncrdes-rcnreq\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/#\\\/schema\\\/person\\\/c4be88e7f16992f06bd9454b6c438f35\",\"name\":\"gregjodoin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74c97b5c8319d25c66a53d1f4188e3d89b01ed5cd835fa62d842f612cd31f4a5?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74c97b5c8319d25c66a53d1f4188e3d89b01ed5cd835fa62d842f612cd31f4a5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/74c97b5c8319d25c66a53d1f4188e3d89b01ed5cd835fa62d842f612cd31f4a5?s=96&d=mm&r=g\",\"caption\":\"gregjodoin\"},\"url\":\"https:\\\/\\\/nationalcapitaldistrictenergy.ca\\\/en\\\/author\\\/gregjodoin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant - Innovate Energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/","og_locale":"en_US","og_type":"article","og_title":"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant - Innovate Energy","og_description":"April 7, 2022 The second in a series about the ISO 50001 Standard and the collaboration between Public Service and Procurement Canada (PSPC) and Innovate Energy (IE). Carlo Burri had...","og_url":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/","og_site_name":"Innovate Energy","article_published_time":"2023-12-18T19:47:20+00:00","article_modified_time":"2026-03-30T18:57:23+00:00","og_image":[{"width":231,"height":282,"url":"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-2.jpg","type":"image\/jpeg"}],"author":"gregjodoin","twitter_card":"summary_large_image","twitter_creator":"@DES_REQ","twitter_site":"@DES_REQ","twitter_misc":{"Written by":"gregjodoin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#article","isPartOf":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/"},"author":{"name":"gregjodoin","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#\/schema\/person\/c4be88e7f16992f06bd9454b6c438f35"},"headline":"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant","datePublished":"2023-12-18T19:47:20+00:00","dateModified":"2026-03-30T18:57:23+00:00","mainEntityOfPage":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/"},"wordCount":318,"commentCount":0,"publisher":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#organization"},"image":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-2.jpg","keywords":["district energy system","Energy Services Acquisition Program","ESAP","ISO","ISO 50001"],"articleSection":["Project Updates"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/","url":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/","name":"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant - Innovate Energy","isPartOf":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#primaryimage"},"image":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-2.jpg","datePublished":"2023-12-18T19:47:20+00:00","dateModified":"2026-03-30T18:57:23+00:00","breadcrumb":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#primaryimage","url":"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-2.jpg","contentUrl":"https:\/\/nationalcapitaldistrictenergy.ca\/wp-content\/uploads\/2023\/12\/image10-e1701700335278-2.jpg","width":231,"height":282},{"@type":"BreadcrumbList","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/iso-50001-confederation-heights-central-heating-and-cooling-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/"},{"@type":"ListItem","position":2,"name":"Project Updates","item":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/project-updates\/"},{"@type":"ListItem","position":3,"name":"ISO 50001 - Confederation Heights' Central Heating and Cooling Plant"}]},{"@type":"WebSite","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#website","url":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/","name":"Innovate Energy","description":"","publisher":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#organization","name":"Innovate Energy","url":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#\/schema\/logo\/image\/","url":"https:\/\/mtdomr.mywhc.ca\/wp-content\/uploads\/2019\/07\/logotype-innovate-energy.png","contentUrl":"https:\/\/mtdomr.mywhc.ca\/wp-content\/uploads\/2019\/07\/logotype-innovate-energy.png","width":504,"height":150,"caption":"Innovate Energy"},"image":{"@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/DES_REQ","https:\/\/www.linkedin.com\/in\/ncrdes-rcnreq\/"]},{"@type":"Person","@id":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/#\/schema\/person\/c4be88e7f16992f06bd9454b6c438f35","name":"gregjodoin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/74c97b5c8319d25c66a53d1f4188e3d89b01ed5cd835fa62d842f612cd31f4a5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/74c97b5c8319d25c66a53d1f4188e3d89b01ed5cd835fa62d842f612cd31f4a5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/74c97b5c8319d25c66a53d1f4188e3d89b01ed5cd835fa62d842f612cd31f4a5?s=96&d=mm&r=g","caption":"gregjodoin"},"url":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/author\/gregjodoin\/"}]}},"_links":{"self":[{"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/posts\/2165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/comments?post=2165"}],"version-history":[{"count":3,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/posts\/2165\/revisions"}],"predecessor-version":[{"id":3676,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/posts\/2165\/revisions\/3676"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/media\/2215"}],"wp:attachment":[{"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/media?parent=2165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/categories?post=2165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nationalcapitaldistrictenergy.ca\/en\/wp-json\/wp\/v2\/tags?post=2165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}